Unable to Intialise ADLM: Internal Error Message: Error Code: <-104>

Unable to Intialise ADLM: Internal Error Message: Error Code: <-104>

When you launch an Autodesk product, the following error message is displayed:

Unable to intialize adlm: Internal Error Message: <Error initializing the Usage tracking component.> Error Code: <-104>

Solution:

  1. Delete the .data file and allow the software to Auto-Activate.
    C:\ProgramData\FLEXnet\adskflex_00691b00_tsf.data
    C:\ProgramData\FLEXnet\adskflex_00691b00_tsf.data_backup.001
  2. You may need to manually activate the software.
  3. Start the product from the shortcut on the Desktop, not from some data files of the product.
  4. If the above doesn’t help, rename “C:\Program Files\Common Files\Macrovision Shared” folder and reinstall your Autodesk software.Note: This error could also be caused when LMU.exe is not running. You can start LMU.exe manually by double-clicking the file in C:\Program Files\Common Files\Autodesk Shared\AdLM\  and then the version-specific R folder (e.g. R11).  You may also need to run C:\Program Files\Common Files\Macrovision Shared\FlexNet Publisher\FNPLicenseingService64.exe file so that FlexNet Licensing Service 64 was started.

In addition to this,  make sure to rename the folders  ADUT as ADUT2 in

  1. C:\Users\<username>\AppData\Roaming\Autodesk\
  2. C:\ProgramData\Autodesk\

Also make sure that the service  FlexNet Licensing Service 64 is set to Automatic by following these steps:

  • Type services.msc in command prompt
  • In the list, look for FlexNet Licensing Service 64
  • Right click on it
  • In Startup Type, select Automatic
  • Click Apply and OK
  • Then Right click again and select Restart

If none of the steps above are helpful, perform a clean uninstall and reinstall the software.

If you need further assistance with your Autodesk Product, you can contact us HERE for product updates and fixes.

What is simulation?

30 June 2025

A simulation is an imitation of a real system or process. It is used to understand, predict, or analyze how a system behaves under different conditions.

What is project planning?

30 June 2025

Learn what design means and how different types of design are used in the construction industry. Streamline your project with Symetri's digital solutions.

What is a BOM (Bill of Materials)? A Complete Guide

30 June 2025

In this guide, we'll explain what a BOM is, how it works, and why it's a critical tool for product success. Whether you're a beginner or looking to optimize your BOM processes, this is your ultimate resource.